Online QC Checking QCI checks the loads for conformation to quality standards. And records the values in Online Quality Inspection Report GALCO-QC/03 and in Online Quality
Read
Jigging
The transferred materials are opened (unbundled) and checked by the Jiggers for damages and for determining the type of cleaning requirement.
Read
Pre Treatment
Stage 1- Alkaline Etch (AD De Greaser/Etcher �Alkaline Medium) The Degreaser/Etcher removes the Rust, dirt, oil etc on the sections
Read
Powder Coating is applied automatically with automatic guns and the operator provides manual touch up (Optional) if required at Faraday cage areas and or on complex sections
Read
Curing The powder coating oven will be set so as to achieve a temperature of 200 degrees on the metal for 10 minutes. The Powder Coated Loads passes through
Read
Off loading After curing, the Loads are offloaded by Offloading personnel and transferred from the conveyor to the unloading Jacks.
Read